What's being built

What's being built in Menangle Park

A plain-English tracker for every planned road, school, shop and park — with its current planning status and the document it comes from.

Talked about1Proposed5Under assessment3In force1Under construction3Open7Last checked 3 Sept 2026

The tracker below lists the roads, parks, shops, schools and services planned for Menangle Park, and where each one has got to.

Read the status, not the picture. Talked about means someone has raised it publicly. Proposed means a plan exists but no consent has been sought or granted. Under assessment means an application is sitting with Campbelltown City Council or a state agency right now and could be approved, amended or refused. Approved means consent exists — not that anything has been dug. In force means an executed agreement is operating: a contract, not a consent, so it approves no building by itself. Under construction means work has started on site. Open means you can use it today. On hold means it has stalled.

The gap that matters most is between approved and open. The Woolworths-anchored town centre is a development application (2503/2026/DA-C) under assessment (see our report); an expanded town centre was part of the developer’s 2020 masterplan announcement and has not been built. Every date attached to a shop, school or road belongs to whoever said it.

Where the numbers come from. Status, funding and timing come from Campbelltown City Council’s registers, the NSW Planning Portal, Transport for NSW and Sydney Water where possible, and from Dahua Group Australia’s newsletters where nothing official exists. Developer material is labelled as such. Any advertising on this page is labelled Sponsor and has no bearing on what the tracker says — including where the advertiser is one of the organisations in it.

Why the dwelling counts disagree. They measure different things, at different dates, over different land:

  • about 3,400 — the yield the November 2017 rezoning provided controls for across the whole release area, as Council’s March 2022 planning proposal describes it.
  • about 3,500, for a population of 9,800 — the same rezoning as described on Council’s planning agreement register, and in the Menangle Park DCP, Part 8A of the Campbelltown (Sustainable City) DCP 2015, October 2021 version. Nothing published explains the 100-dwelling difference.
  • 3,000 to 4,000, on the developer’s land only — the change made by planning proposal PP-2020-3129, made on 29 April 2022. An increase of 1,000 dwellings.
  • “4,000+ homesites”Dahua’s project page, the developer’s own marketing, covering its landholding.
  • about 4,000 new homes — what Sydney Water says its new Menangle Park pumping stations will service, as at 7 July 2026.
  • up to 4,525 final lots — the ceiling written into the 2024 planning agreement, per the explanatory note Council and Dahua prepared together. A cap on what may be created, not a forecast of what will be. Council’s officer report to its Local Planning Panel on 23 October 2024 goes further: it says that under the planning proposal finalised on 29 April 2022 “lot yield was increased to 4,525” (minutes, PDF), which does not match the Department’s finalisation report for the same proposal — approximately 4,000 dwellings, an increase of about 1,000. “Dwelling yield” and “final lots” are not necessarily the same measure, and Council’s documents use both figures.

The number that was superseded. A figure of about 5,250 dwellings — an increase of 1,850 — was published in June 2020 and remains in the developer’s news post from that month. It came from a GTA transport impact assessment. Transport for NSW queried it during exhibition, and Council answered in its March 2022 planning proposal: “the reference in the GTA Transport Impact Statement (TIA) to an increase in approximately 1,850 dwellings has since been superseded. The correct increase in dwellings is 1,000.” Council said it had told the Transport for NSW project teams. Council expressly superseded that figure, so any current claim of 5,200 to 5,250 for Menangle Park should be checked to see whether it is repeating the older transport report.

Do not average them. The developer’s figure counts its own lots. The utility number is what the pipes are sized for. The planning agreement number is a legal cap, and Council has since described 4,525 as a lot yield as well. And 5,250 is not a planning number at all any more.

Two more proposals sit outside every number above. Both are in Menangle Park, neither is part of the Dahua release area, and neither is counted in any of the dwelling figures listed here. Both are rezoning requests — a request to change what land may be used for — not development applications and not consents.

  • Rosalind Park (PP-2022-3252) covers about 264 hectares at 33 Medhurst Road and 101 and 111 Menangle Road. Its Gateway determination, dated 25 August 2025, requires a provision setting the dwelling cap for the site at “290 dwellings with a maximum dwelling potential of 1,450 dwellings”. It was exhibited from 8 July to 21 August 2026 (see our report). Gateway condition 10 gave 12 months to complete the amendment, which Campbelltown City Council’s 10 February 2026 report reads as a lapsing date of 25 August 2026. As at 30 August 2026 the amendment had not been made, and neither an extension nor a lapsing notice has been published.
  • Menangle Park (East Village) (PP-2024-2724) covers 22 parcels, about 19 hectares of the established village bounded by Cummins Road, Fitzpatrick Street, Racecourse Avenue and Taber Street, and is lodged by Michael Brown Planning Strategies for a number of separate landowners. Council endorsed it on 9 December 2025 by 8 votes to 2 and sent it to the Department for a Gateway determination, at 1,907 dwellings against about 340 permitted by the existing R2 zoning (see our report). The Planning Portal recorded it as “Under Assessment” at the Gateway Determination stage on 30 August 2026, with no date of determination.

Both have tracker entries below. Neither number belongs in a total for the suburb yet.

How the suburb got this name in the first place is a separate story from the rezoning above — see history of Menangle Park.

Land area is three numbers too. The October 2016 planning proposal put the whole Menangle Park Urban Release Area at about 958 hectares. Dahua’s landholding inside it was stated at 507 hectares in Council’s March 2022 planning proposal, and is marketed today as 498 hectares. The developer’s hectares are not the release area’s hectares.

Roads & access

5

Spring Farm Parkway Stage 1

Transport for NSW

Open

A four-lane divided road running about 1 km from Menangle Road west over the Hume Motorway into the release area, with 600 m of Menangle Road upgraded, four new signalised intersections and a shared-use path on the southern side. It is built and open to traffic. The ramps are city-facing only, so this is motorway access in one direction, not a full interchange.

Stated timing:
Transport for NSW's project page says it opened to traffic "from Thursday 29 August" 2024; its Stage 2 community update of August 2025 gives 28 August 2024. The two official documents differ by one day.
30 Aug 2026
What this means for you

What this means for you. Sydney-bound trips are the easy ones. Transport for NSW lists a north-facing exit ramp off the Hume onto Spring Farm Parkway and a north-facing entry ramp back on, so a run to Liverpool, Parramatta or the CBD starts at your own end of the suburb.

Southbound is the gap. Trips towards Picton Road, Wollongong or Canberra need a different interchange, and no Transport for NSW source found names which one — check Live Traffic or a map before you assume. The parkway also carries a shared-use path on its southern side giving walking and cycling access to Broughton Anglican College.

Spring Farm Parkway Stage 2

Transport for NSW

Proposed

A proposed 3 km four-lane divided road that would complete the east-west link from Stage 1 west to Liz Kernohan Drive, joining the Camden Bypass, the Hume Motorway and Menangle Road. It is funded for planning only. Transport for NSW's next-steps list marks detailed design, tender, contractor appointment and start of construction as "subject to funding", so there is no construction commitment and no construction date.

Stated timing:
Transport for NSW says the concept design and Review of Environmental Factors are expected on public display in late 2026, with the final business case completed by early 2027. As at 30 August 2026 that display had not happened.
30 Aug 2026
What this means for you

What this means for you. The $15 million committed by the Australian and NSW Governments funds environmental assessment and concept design. Jacobs Australia was appointed in May 2025 to do that design work.

No construction funding has been announced for the western link to Camden and the Camden Bypass (see our report). Transport for NSW says the finished parkway would divert around 30,000 cars a day from Narellan Road, which is why it matters locally. Transport for NSW said in May 2025 that the final business case would be complete by early 2027; construction is listed as “subject to funding” on its next-steps list. The date to watch is the REF going on public display.

Menangle Road upgrade

Transport for NSW

Talked about

A proposed widening of Menangle Road between Tindall Street, Campbelltown and Cummins Road, Menangle Park. It sits in the $65 million South West Sydney Roads Planning program, which prepares business cases only and runs to 2028. Geotechnical and utility investigations were finished between December 2022 and March 2023, and as at October 2025 Transport for NSW said concept design and environmental planning would "soon start". There is no announced construction date.

Stated timing:
Transport for NSW said in October 2025 that concept design and environmental planning would soon start. No construction date has been announced.
30 Aug 2026
What this means for you

What this means for you. Menangle Road is the road most people here drive every day to reach Campbelltown, and this upgrade is at the investigation stage. The program funds planning, not construction. Business cases are due by 2028, and any construction funding would be a separate decision after that.

Plan your commute on the road as it exists now, not as it might be. Every new stage of the estate, plus the separately proposed Rosalind Park rezoning, would feed more traffic onto the same corridor ahead of any upgrade. The project infoline is 1800 684 490.

Appin Road upgrade Stage 1

Transport for NSW

Open

Widening of Appin Road from two to four lanes in part, with safety barriers, new intersections into the Figtree Hill community and five kilometres of koala exclusion fencing. Transport for NSW says construction was completed in March 2026, so this one is finished and open. Stage 2, covering further safety improvements and an additional wildlife underpass at Beulah Reserve, is at strategic concept design stage.

Stated timing:
Transport for NSW says Stage 1 construction was completed in March 2026. Stage 2 has no construction date.
30 Aug 2026
What this means for you

What this means for you. Appin Road is the run south-east towards Appin and on to Wollongong via Bulli Pass, and the finished Stage 1 section is safer and wider than it was. The koala fencing is the part locals notice: it changes where wildlife crosses, and a koala underpass near Noorumba Reserve was complete as at June 2026, waiting on landscaping before it opens to animals.

Further north, the Appin Road and St Johns Road intersection upgrade at Bradbury was determined in January 2026 with $22.5 million committed by the Australian Government, and Transport for NSW said construction was expected to start in 2026 and take about 12 months. As at 30 August 2026 the project page showed “Project determination”, so construction had not started on the published record.

New Menangle Road estate intersection

Transport for NSW (design approval); Dahua Group Australia (delivery)

Proposed

A new intersection on Menangle Road that would connect Miracle Mile Boulevard North to Danehill Avenue South, giving the estate another way in and out. Dahua Group Australia says it is working with Transport for NSW to obtain design approval. As at the developer's August 2026 newsletter the project was at the design-approval stage — not approved and not under construction.

Stated timing:
Dahua Group Australia's Spring 2026 newsletter says works were expected to commence in late 2026, with construction targeted for completion by the end of 2027.
30 Aug 2026
What this means for you

What this means for you. A second signalised access point would matter more than it sounds, because the estate currently funnels its traffic through a small number of connections to Menangle Road. If it is built, expect lane closures and temporary changes on Menangle Road while it goes in.

The source for this project is the developer’s newsletter, and the milestone it reports is design approval, which Transport for NSW gives. A late-2026 start is Dahua’s expectation; the timing depends on Transport for NSW granting it, which the newsletter says Dahua is working to obtain. No Transport for NSW source found in this research names the project.

Rail & public transport

3

Menangle Park railway station

Transport for NSW

Open

The suburb has its own station on the Southern Highlands Line, at Racecourse Avenue. It is open and running, with 21 trains a weekday towards Campbelltown and 23 towards Moss Vale on Transport for NSW's trip planner as at 31 August 2026, dropping to 20 and 22 when the timetable changes on 19 September — broadly hourly either way, not a turn-up-and-go service. Getting to it is the catch: measured on two routing engines, the released Miracle Mile Boulevard stages are a 23 to 25 minute walk away, and whether a continuous footpath exists is not published. Transport for NSW lists the station as unattended at all times, classes it as Assisted Access, and sells no Opal top-up on site. No station rebuild or accessibility upgrade is under construction.

Stated timing:
Transport for NSW says planning and investigations are still underway to determine the final scope and construction start date for the remaining Rail Infrastructure Upgrades locations. Menangle Park has no announced construction date.
3 Sept 2026
What this means for you

What this means for you. Getting to the platform comes first. On two routing engines run on 30 August 2026 — Transport for NSW’s trip planner in walk-only mode and the FOSSGIS OSRM foot profile — the station is 1,653 to 1,724 metres and 23 to 25 minutes on foot from the Miracle Mile Boulevard bus stops, 1,222 to 1,289 metres and 17 to 18 minutes from Danehill Avenue, and about 620 metres and 8 minutes from the western end of Beersheba Parade at the Racecourse Avenue junction (a map point, not a bus stop, routed with OSRM only). Campbelltown City Council’s development control plan defines walking distance from a train station as “800m or a 10 minute walk”, so the Miracle Mile stages are roughly double that benchmark. Dahua’s marketing gives “just a 5 minute walk”, against that measured range. Whether a continuous built footpath exists over the route is not published: no Council, Transport for NSW or development control plan source found in this research states what is constructed on Cummins Road, Payten Street or Racecourse Avenue. By car it is 0.5 to 2.0 km; on the 889, the outbound stop opposite the station is 4 minutes from Miracle Mile Boulevard.

Once you are on it, it is about 6 minutes to Macarthur and 8 to 12 to Campbelltown depending on the service, then a change at Campbelltown for the T8 line to Sydney Airport and Central. Miss a train and you often wait an hour, sometimes longer, and weekends are thinner. The timetable changes on 19 September 2026; the commute guide carries both, and trackwork happens, so check the Trip Planner.

Use Transport for NSW’s trip planner rather than the printed timetable. The Southern Highlands Line PDF, which Transport for NSW labels “Current”, is stamped valid from 20 October 2024, and its Menangle Park times differ from the trip planner’s. A standing alert, “until further notice”, also warns of temporary speed restrictions on the line.

There is no Opal top-up here, so arrive with a loaded card or use a contactless card. Transport for NSW’s stop page lists a commuter car park under Facilities but no number of spaces. One figure was published and then corrected: the February 2019 Spring Farm Parkway Stage 1 Review of Environmental Factors gave free long-stay parking for up to 650 cars, and Roads and Maritime Services corrected it in its October 2019 submissions report — “Section 6.1.2 of the REF incorrectly identified that long stay station parking is provided at Menangle Park Station for up 650 cars. Informal car parking is provided at the station.” The October 2019 correction means 650 was an error rather than an older figure, and the correction itself does not say whether the parking is free. Menangle Park is not on Transport for NSW’s Commuter Car Park Program list.

On accessibility, Transport for NSW classes the station as Assisted Access and lists wheelchair ramp boarding assistance, a hearing loop, a PA system and a level crossing among its features — no lift and no ramp to platform. Its trip-planner data returns WheelchairAccess “false” for Platform 1, against “true” at Macarthur, Leumeah and Ingleburn. The agency publishes no reason for the classification and no definition of Assisted Access. What the records do show is that moving between the platforms means crossing the running lines at grade; whether that is the reason is our inference, not Transport for NSW’s. A boarding ramp answers a narrower question — ramps are carried on the train or kept on the platform, but only work at specific boarding assistance zones, and Transport for NSW tells customers to check whether a station is attended. Menangle Park is unattended at all times.

Transport for NSW’s February 2026 notification describes the March 2026 works here as site investigations, surveying and vegetation trimming. Some property marketing has described the same works as major station upgrades in construction.

Bus route 889 seven-day service

Transit Systems NSW SW, for Transport for NSW

Open

Route 889 is an existing route that was upgraded in 2026. From 5 July 2026 the Macarthur to Menangle loop via Menangle Park became a seven-day service with an additional 83 trips a week, where it had previously run up to twelve times a day, six days a week. The current timetable shows about 23 weekday trips and hourly running on Saturdays, Sundays and public holidays from roughly 6am to 10pm. It is open and operating.

Stated timing:
The upgraded seven-day service started on 5 July 2026, funded from the $452 million committed in the 2025-26 NSW Budget to expand outer-suburban bus services.
30 Aug 2026
What this means for you

What this means for you. This is the biggest recent improvement to getting around here. Weekend buses now exist. From the estate stops on Danehill Avenue and Miracle Mile Boulevard it is roughly 8 to 10 minutes to Macarthur Station and Macarthur Square.

Because it is a loop, the direction you board makes a big difference to your travel time. Macarthur out to Menangle Park Station takes about 30 minutes; the same station back to Macarthur takes about 19. Check which way the bus is going before you get on. The timetable also carries dedicated school trips to and from Broughton Anglican College. It remains the only regular public bus route serving Menangle Park, on Transport for NSW’s route information checked on 30 August 2026.

Every 889 trip is wheelchair accessible. The accessible symbol heads every service column on the current timetable — weekday, Saturday and Sunday — and the timetable’s own note says the buses have low floors and space for a wheelchair, pram or stroller. That matters here, because Transport for NSW records Menangle Park Station itself as not wheelchair accessible.

Bus route 845 to Western Sydney International

Transport for NSW

Open

A bus route linking Campbelltown with Western Sydney International Airport via Oran Park, every 30 minutes from 5am to 10pm, seven days a week. Transport for NSW says it started on Sunday 5 July 2026, so the route is running. Transport for NSW's airport-travel page says access into the airport site will not be available until the airport opens in late October 2026.

Stated timing:
The Australian Government says Western Sydney International (Nancy-Bird Walton) Airport began freight operations on 26 July 2026, with Qantas Freight regular services from 27 July, and opens to passengers on 25 October 2026.
3 Sept 2026
What this means for you

What this means for you. There is no direct bus from Menangle Park to the new airport. Take the train to Campbelltown and change to the 845, which starts at Campbelltown Station; if you begin on the 889, change at Macarthur for a one-stop train to Campbelltown first. Two or three connections, each with its own timetable, so budget generously rather than trusting a single quoted travel time.

Driving is the realistic option for most trips: about 33 km and 38 minutes in free-flow conditions from the estate entrance, via the Hume Motorway, Narellan Road and The Northern Road — signalised arterial roads for most of the way, not motorway. The toll-free M12, open since 14 March 2026, serves the airport from the M7 side and is not on this route. Transport for NSW’s page, in its note on the M12, says access into the airport site will not be available until the airport opens in late October 2026, so for a resident this route is one to bookmark rather than use until 25 October.

Shops & town centre

1

Woolworths neighbourhood shopping centre, within the planned Town Centre

Campbelltown City Council · 2503/2026/DA-C

Under assessment

A full-line Woolworths, specialty retail, childcare, a medical centre and an indoor recreation facility with a swim school, proposed on a site of about 37,000 sqm inside the estate. Woolworths lodged DA 2503/2026/DA-C with Campbelltown City Council in May 2026 and the application is under assessment. It has not been publicly exhibited, determined or approved. Woolworths describes it as a neighbourhood shopping centre that is part of the planned Menangle Park Town Centre; the application covers that retail component, not every element shown in earlier Town Centre masterplans. Menangle Park has no supermarket of its own in the meantime.

Stated timing:
Dahua Group Australia says construction is targeted to start in 2027 with opening anticipated late 2028, subject to approval. Woolworths' consultation site lists public exhibition and Council determination as stages to come.
3 Sept 2026
What this means for you

What this means for you. Nothing changes at your kitchen table yet. Every grocery, chemist and post office trip still means leaving the suburb, most often north up Menangle Road to Macarthur Square or Marketfair at Campbelltown, both about 7 to 8 km away. Assume that stays true for years, not months.

An application under assessment can be modified, refused, or approved with conditions that shift the design and the timing. Treat 2027 construction and a late-2028 opening as the proponent’s targets, subject to approval. For context, Dahua’s 2020 revised masterplan described a 30,000 sqm retail and employment zone for Menangle Park. This application is the retail component now before Council. You can follow the application yourself by searching 2503/2026/DA-C on Council’s Development Online.

Schools

1

Menangle Park public primary school

School Infrastructure NSW (NSW Department of Education)

Proposed

A new NSW public primary school with a co-located public early learning service, to be built centrally in the precinct near the future town centre. School Infrastructure NSW's project page places it within the $4.1 billion for new and upgraded schools in Western Sydney, part of the 2026-27 NSW Budget's $9.2 billion school infrastructure program, and has it at the design stage. Planning approval had not been sought as at the June 2026 planning update, so it is funded and designed but not consented, and the opening date is School Infrastructure NSW's stated target.

Stated timing:
School Infrastructure NSW says "the new school will open to students for Day 1 Term 1 2029" and that it will have capacity for 500 students, master planned for future expansion.
30 Aug 2026
What this means for you

What this means for you. If your child starts school before 2029, this school is not due to be open in time. Menangle Park addresses currently sit in the Douglas Park Public School intake area, about 9 km away, and Broughton Anglican College is the only school physically in the suburb. Check your own address on School Finder.

The scope is real: 24 classrooms, three support learning classrooms, a hall, a covered outdoor learning area, a full-sized playing field and a multipurpose court. As at June 2026 the Department had completed an initial master plan, and School Infrastructure NSW said site due diligence would start “later in 2026” and that a community information session would be held before planning approval is sought. No school site address has been published, and no intake area has been drawn.

Parks & open space

3

Northern Hill Top Park

Dahua Group Australia (delivery); Campbelltown City Council (land dedication under the 2024 planning agreement)

Open

Elevated landscaped open space in the northern part of the Dahua estate. It is built and open — the developer's Spring 2026 newsletter says it opened in 2025. It is the estate's only finished park: the Southern Hill Top Park is under construction and the sports precinct is not built.

Stated timing:
Dahua Group Australia's Spring 2026 newsletter says the northern park opened in 2025.
30 Aug 2026
What this means for you

What this means for you. This is a park you can walk to today. That matters, because the Menangle Park DCP requires every dwelling in the release area to sit within 400 metres of a public park, and most of that network is yet to be built.

The source for the opening is the developer’s newsletter, so there is less public detail than there would be for a Council asset. Open space land across the estate is being dedicated to Campbelltown City Council under the 2024 planning agreement, which is what eventually makes maintenance Council’s job rather than the developer’s.

Southern Hill Top Park

Dahua Group Australia

Under construction

About 11,000 square metres of landscaped elevated open space in the southern part of the estate, delivered alongside the Stage 4 South release. It is under construction. Dahua Group Australia targeted completion in late Q3 2026 with a community opening shortly afterwards, which is a developer target rather than a confirmed opening date.

Stated timing:
Dahua Group Australia's Spring 2026 newsletter targets completion in late Q3 2026, with a community opening shortly afterwards.
30 Aug 2026
What this means for you

What this means for you. The second of the two hill top parks, and the one that serves the southern end of the estate. If the developer’s target holds, it should be finished around now and open not long after — but no independent source confirms either the completion or the opening.

A park is open when you can walk into it. If you are buying in the southern stages partly for this open space, ask the developer for the current completion date in writing.

Southern Riparian and Sports Fields precinct

Dahua Group Australia

Proposed

The estate's planned sports and recreation precinct — almost 20 hectares of open space with sporting fields, multipurpose courts, an amenity building and dedicated parking, plus a riparian corridor project with an elevated boardwalk and picnic shelters. It is proposed, not built and not started. As at the developer's August 2026 newsletter, works were programmed to commence in Q4 2026.

Stated timing:
Dahua Group Australia's Spring 2026 newsletter says works were programmed to commence in Q4 2026. That is a developer forecast, and the works had not started when it was published.
30 Aug 2026
What this means for you

What this means for you. The public sports fields planned for the estate have not been built. If your family plays weekend sport, you are travelling for it, and you should assume that continues for some time yet.

The project manager acting for Dahua describes a Playing Fields Park with four sports fields, kick-about areas, an amenities building, a themed playground, shared paths, parking and lighting. That page gives no construction or completion dates. The only date in the public record is the developer’s “programmed to commence Q4 2026”, published with the works not yet started. No approval or contractor for the precinct was found in this research.

Community facilities

1

Menangle Park Release Area Planning Agreement

Campbelltown City Council

In force

The executed agreement that binds the developer to deliver Menangle Park's public infrastructure. It is filed here as in force because it is signed and operating — but it is a contract between Council and the developer, not a development consent, and it approves no building by itself. Campbelltown City Council and two Dahua entities entered into it on 15 August 2024, covering all of Dahua's Menangle Park landholding and revoking the earlier February 2021 Stages 1, 2A and 2B agreement. It defines the development as creating up to 4,525 final lots, and commits about $202 million of infrastructure and about 1,021,922 square metres of land dedication. Those are staged obligations contingent on the development proceeding, not money already spent.

Stated timing:
Obligations are staged and fall due as development proceeds. Council's register records $7,123,347.42 in monetary contributions already paid for Stages 1 and 2A.
3 Sept 2026
What this means for you

What this means for you. This is the document behind most of the parks, roads and drainage on the masterplan. Council’s register breaks the commitment into open space and recreation land and works, traffic and transport land and works, trunk drainage and water quality, and community facility land.

Read the word “commits” carefully. The headline figure is what the developer is obliged to deliver over the life of the estate, not a bank balance. If sales slow and stages are deferred, the works attached to those stages are deferred with them. The register is public, so if you want to know what has been dedicated to Council so far, that is where to look.

Utilities

3

Sydney Water servicing works

Sydney Water

Under construction

Sydney Water is building two new wastewater pumping stations at Menangle Park, upgrading a third, and laying a 2.2 km water main to Menangle. Work is under construction. Sydney Water says the infrastructure will service about 4,000 new homes in Menangle Park, and that the water main provides capacity for 750 new homes. All completion dates below are Sydney Water projections and subject to change.

Stated timing:
In its 7 July 2026 update Sydney Water said the new pumping station at Menangle Road and Danehill Avenue was on track to be finished by March 2027; the upgrade to the existing station north of Fitzpatrick Street was almost finished and due by September 2026; the Menangle pumping station was expected by August 2027; and the 2.2 km water main, about 1.7 km complete, was expected by September 2026.
30 Aug 2026
What this means for you

What this means for you. Water and wastewater capacity is a gate on everything else. Registration and occupation depend on the required servicing being in place or otherwise accepted. SMEC, the estate’s lead civil designer, says it installed an interim pump-out system while Sydney Water’s permanent pump station was delayed, so residential development could keep going.

One number worth holding onto. Sydney Water describes this infrastructure as servicing about 4,000 new homes, which matches what Dahua markets on its own landholding — “4,000+ homesites”. The two agree, but neither is a cap: the 2024 planning agreement between Council and Dahua allows up to 4,525 final lots. Read 4,000 as what these pipes were sized for, not as a limit on how many houses get built.

nbn Fibre to the Premises

nbn

Open

Four Menangle Park addresses checked against nbn's own address servicing lookup on 30 August 2026 all returned Fibre to the Premises, fixed line, available — the highest-tier fixed-line nbn technology, in a greenfields serving area within the Campbelltown coverage area. Ready-for-service dates on those addresses ranged from July 2017 to May 2024. Four addresses is not the whole suburb, so check your own before you sign anything.

Stated timing:
Ready-for-service dates returned by the lookup on the addresses checked ranged from July 2017 to May 2024. nbn publishes availability address by address, not suburb by suburb.
3 Sept 2026
What this means for you

What this means for you. For working from home, this is the best fixed-line technology nbn builds — fibre the whole way to the house, with no copper leg. The addresses checked returned FTTP as available. Confirm any installation or new-development charge with your chosen provider before you sign: nbn’s policy for new developments says it may charge a one-time end-user contribution of up to $300 for each premises in a new development, and that providers may pass it on.

A suburb-wide answer will not tell you about your own address. Availability is determined address by address, and older parts of Menangle Park were connected at different times from the new estate. Put your exact street address into nbn’s Check Address tool, and if you are buying land, ask for the lot’s status rather than the street’s.

Endeavour Energy zone substation

Endeavour Energy

Proposed

Endeavour Energy is proposing to upgrade the existing mobile substation on Fitzpatrick Road, Menangle Park to a permanent zone substation with two new transformers, a permanent building, drainage, fencing and a 15-metre communication antenna, plus a new 66kV underground feeder from TransGrid's Macarthur Bulk Supply Point along Fitzpatrick Road and Glenlee Road. Both projects were in environmental assessment under Part 5 of the Environmental Planning and Assessment Act when published. No construction start date is published.

Stated timing:
Endeavour Energy states the existing mobile substation lacks capacity beyond 2027. Its Distribution Annual Planning Report 2025 records planned commissioning of the permanent substation in FY28, and the September 2025 feeder Review of Environmental Factors gives a 24-to-30-month program from a late-2025 or early-2026 start. No determination and no construction start date is published for either the permanent substation or the 66kV feeder.
30 Aug 2026
What this means for you

What this means for you. Power supply is one of the less visible constraints on the estate, and possibly the most important. Endeavour Energy says the mobile substation now feeding Menangle Park does not have capacity beyond 2027, and the permanent replacement has no published determination and no published construction start date. It is assessed under Part 5 of the Environmental Planning and Assessment Act, with Endeavour Energy both proponent and determining authority — so there is no council consent to look up. Endeavour publishes a forecast constraint, not a connections freeze: no moratorium, queue or refusal on new connections is published.

If you are weighing up a later stage or a 2028 build, that gap is worth asking about — of the developer, and of Endeavour Energy directly. The project page is live and the status can change, so re-check it rather than relying on this entry. Enquiries go to environment@endeavourenergy.com.au. For outages and electrical emergencies the number is 131 003, 24 hours.

Housing & land

3

Estate stages 3 North Phase 2 and 4 North

Dahua Group Australia

Under construction

The two residential stages currently being built in the Dahua estate, delivering 348 lots between them. Civil construction started in March 2026, with WEM Civil on Stage 3 North Phase 2 and TRN Group on Stage 4 North. As at 30 August 2026 the developer's stage tracker showed both about 40 per cent complete and in the sewer and drainage phase, with titles targeted for April 2027 on Stage 3 North Phase 2 and May 2027 on Stage 4 North.

Stated timing:
Dahua Group Australia's stage tracker, read on 30 August 2026, targets construction completion on 26 March 2027 for Stage 3 North Phase 2, with titles in April 2027 and settlement from 29 April 2027; and 22 April 2027 for Stage 4 North, with titles in May 2027 and settlement from 15 May 2027. The Spring 2026 newsletter had anticipated construction completion in the first quarter of 2027. All are developer projections.
30 Aug 2026
What this means for you

What this means for you. If you already live here, expect dust, construction traffic and unfinished verges nearby for another year or so. If you are buying, understand the sequence: civil works finish, then the plan registers, then you settle, then you build. Each step can slip. The developer publishes target dates for construction completion, titles and settlement; each is a projection until the milestone is reached.

Spine Road South is finished and delivered 49 lots in the Rosewood release. For context on the pace, the developer’s tracker lists eight earlier stages that reached titles between the fourth quarter of 2023 and January 2026 — Stage 3 South 3.1 to 3.4, Stage 2B, then 3.6, 3.8 and 3.7, Stage 3 North in June 2025, and Stage 4 South 4.1 to 4.2 in late September 2025 and 4.3 to 4.4 in January 2026. That is a record of stages registered, not a count of lots or houses.

No authority publishes a current figure for how many homes are completed and occupied at Menangle Park. The most recent count found is a developer figure of approximately 250 homes dated 23 September 2024, now nearly two years old. Any current population figure is an estimate.

Rosalind Park planning proposal

Campbelltown City Council and the NSW Department of Planning, Housing and Infrastructure · PP-2022-3252

Under assessment

Planning proposal PP-2022-3252 over about 264 hectares at 33 Medhurst Road and 101 and 111 Menangle Road, Menangle Park, lodged by SJB Planning for Leda Holdings Pty Ltd. It is a rezoning request, not an approved development. The Gateway determination dated 25 August 2025 redirected it from Campbelltown LEP 2015 to the Western Parkland City precincts SEPP and requires a provision capping the site at 290 dwellings with a maximum dwelling potential of 1,450. It was publicly exhibited from 8 July to 21 August 2026. Gateway condition 10 gave 12 months to complete the amendment, which Council read as a lapsing date of 25 August 2026. As at 30 August 2026 the amendment had not been made, and no extension and no lapsing notice have been published.

Stated timing:
Council's next steps, published in its 10 February 2026 report, are to report a draft development control plan and a draft planning agreement to Council for exhibition, exhibit them, prepare a post-exhibition report, then finalise the SEPP amendment for the Department. No date is published for any of those steps, and no post-exhibition report had been published as at 30 August 2026.
30 Aug 2026
What this means for you

What this means for you. This is not part of the Dahua estate and it is not a development you can buy into. It is a request to change the planning rules on a separate landholding in the same suburb, on about 264 hectares at 33 Medhurst Road and 101 and 111 Menangle Road. If the rules are changed, development applications would still have to follow.

Read 1,450 as a ceiling, and 290 as the number with a route to consent. Gateway condition 1(b) requires the proposal to include a provision setting the dwelling cap for the site at “290 dwellings with a maximum dwelling potential of 1,450 dwellings”. Campbelltown City Council’s 10 February 2026 report describes it as “a condition initially capping development at 290 dwellings”, says the cap is “driven primarily by the need to confirm the timing and delivery of wastewater servicing for the precinct” and is “linked to Sydney Water’s servicing constraints”. Council’s report describes the wider proposal as roughly 1,450 dwellings, 13 hectares of public open space, a local centre, a 3.2 hectare primary school site and about 76 hectares for environmental conservation and supporting uses.

The two Gateway dates you will see are both real. The determination instrument is dated 25 August 2025 and signed by Daniel Thompson, Executive Director, Local Planning and Council Support at the Department of Planning, Housing and Infrastructure, as delegate of the Minister. The NSW Planning Portal separately records a Date of Determination of 5 September 2025 with a Gateway decision of “Approved”. The 25 August 2025 date is the one on the determination itself, the one Council uses, and the one the 12-month clock runs from. A single alteration, dated 9 October 2025, changed condition 6 only: a draft development control plan no longer had to be exhibited at the same time as the proposal, but must still be exhibited before the proposal is finalised. It did not extend the timeframe.

Where the process stood at the deadline. Exhibition ran from 8 July to 21 August 2026 and closed four days before the deadline, which left no window for a post-exhibition report to be prepared and considered before it. The draft development control plan required before finalisation has not been exhibited — Council’s exhibition page says it is not yet available and that “Once the draft DCP has been prepared, it will be reported to Council for the purpose of seeking endorsement for public exhibition.” A draft planning agreement was not exhibited with the proposal. Council has not published how many submissions it received.

Expiry is not automatically fatal. The Department’s Local Environmental Plan Making Guideline says any request to extend a Gateway timeframe “must be justified and include clear revised milestones for completion”, and that the Minister “may alter a Gateway determination to not proceed, appoint the Secretary (or other person or body) as PPA, or proceed to make the plan where significant delays occur”. A Gateway determination can be altered under section 3.34(7) of the Environmental Planning and Assessment Act 1979 — the same power used for the 9 October 2025 alteration.

What to watch. A second Gateway alteration document appearing on the PP-2022-3252 record on the Planning Portal would be the first public sign of an extension; the existing one is numbered GA-2025-158. After that, the post-exhibition report on a Campbelltown City Council business paper, and the Department’s amendments list for the Western Parkland City precincts SEPP. Ask Council directly before you act on this proposal in either direction.

The scale is what matters locally. Up to 1,450 dwellings on 264 hectares would feed onto Menangle Road, and the Gateway conditions carry a koala corridors map requiring the Planning Secretary’s concurrence before consent, a requirement that 5 per cent of medium density dwellings be delivered as affordable housing, and consultation with Subsidence Advisory NSW, the SES, the Rural Fire Service and Wollondilly Shire Council.

Menangle Park (East Village) rezoning

Campbelltown City Council and the NSW Department of Planning, Housing and Infrastructure · PP-2024-2724

Under assessment

A site-specific planning proposal, PP-2024-2724, to amend Campbelltown Local Environmental Plan 2015 over 22 parcels totalling about 19 hectares in the established village — the block bounded by Cummins Road, Fitzpatrick Street, Racecourse Avenue and Taber Street, west of the proposed town centre. It is a rezoning request, not a development application and not a development consent. The applicant is Michael Brown Planning Strategies, acting for a number of separate landowners; it is not a Dahua proposal. The yield has moved four times — 2,179 dwellings in 2022, 1,915 in 2024, 2,073 in March 2025 and 1,907 in the version Council endorsed on 9 December 2025, against about 340 permitted by the existing R2 zoning. Council endorsed it for a Gateway determination; the Department has not recorded one.

Stated timing:
The NSW Planning Portal recorded PP-2024-2724 as "Under Assessment" at the Gateway Determination stage on 3 September 2026, with no date of determination and no Gateway decision. The proponent's timeline in the December 2025 proposal had a Gateway determination in March 2026, public exhibition in April–May 2026 and the LEP amendment made in October 2026. Council's 9 December 2025 resolution also requires a draft amendment to the Menangle Park Contributions Plan and a draft development control plan before any public exhibition, and neither had come back to Council through the 11 August 2026 meeting.
3 Sept 2026
What this means for you

What this means for you. The site is the older village grid, and the proposal would lift its height limit from 8.5 metres to 11, 12 and 22 metres and remove the minimum lot size. On traffic, the proposal’s own assessment forecasts a net increase of over 750 vehicle trips in each of the morning and evening peaks, with the Spring Farm Parkway / North-South Collector Road intersection running over capacity at Level of Service F in both. The assessment’s response relies on Menangle Road: a sensitivity test diverts about 400 to 500 cars a peak onto the Menangle Road / North-South Collector Road intersection instead. Council’s December 2025 report says funding for the infrastructure needed to support the proposal “has not been fully detailed and documented”.

Every status here reflects the public record, not a promise of delivery. Approvals can be appealed, amended or withdrawn — always check the source document for the current position.