What's being built

What's being built in Menangle Park

A tracker of the major roads, schools, shops, parks and services planned for or affecting Menangle Park, from early planning through to opening, with each one's current status and the document it comes from.

Page updated: ·Each project verified individually below (30 Aug 2026 – 4 Oct 2026)

The tracker below covers major roads, schools, shopping centres, parks and infrastructure projects planned or under construction in Menangle Park. Every card displays its current planning stage, funding status, stated timing, next step, and the official public documents behind it.

How to read the stages. Planning means business cases, site due diligence or concept design are underway before formal exhibition. Proposed means a master plan or developer intent exists without formal consent sought. Public exhibition means community comment is open for feedback. Under assessment means a formal application is before Council or the Department of Planning. Approved means planning consent exists. In force means an executed planning agreement is legally operating. Under construction means ground works are actively underway. Open means built and available for use today.

Background: Understanding Menangle Park's dwelling yields and planning numbers Show details ↓

Why the dwelling counts disagree. They measure different things, at different dates, over different land:

  • about 3,400 — the yield the November 2017 rezoning provided controls for across the whole release area, as Council’s March 2022 planning proposal describes it.
  • about 3,500, for a population of 9,800 — the same rezoning as described on Council’s planning agreement register, and in the Menangle Park DCP, Part 8A of the Campbelltown (Sustainable City) DCP 2015, October 2021 version.
  • 3,000 to 4,000, on the developer’s land only — the change made by planning proposal PP-2020-3129, made on 29 April 2022. An increase of 1,000 dwellings.
  • “4,000+ homesites” — Dahua’s project page, the developer’s own marketing, covering its landholding.
  • about 4,000 new homes — what Sydney Water says its new Menangle Park pumping stations will service, as at 7 July 2026.
  • up to 4,525 final lots — the ceiling written into the 2024 planning agreement, per the explanatory note Council and Dahua prepared together. A cap on what may be created, not a forecast of what will be. Council’s officer report to its Local Planning Panel on 23 October 2024 goes further: it says that under the planning proposal finalised on 29 April 2022 “lot yield was increased to 4,525” (minutes, PDF). The Department’s finalisation report for the same proposal gives approximately 4,000 dwellings, an increase of about 1,000. “Dwelling yield” and “final lots” are not necessarily the same measure, and Council’s documents use both figures.

The number that was superseded. A figure of about 5,250 dwellings — an increase of 1,850 — was published in June 2020 and remains in the developer’s news post from that month. It came from a GTA transport impact assessment. Transport for NSW queried it during exhibition, and Council answered in its March 2022 planning proposal: “the reference in the GTA Transport Impact Statement (TIA) to an increase in approximately 1,850 dwellings has since been superseded. The correct increase in dwellings is 1,000.” Council said it had told the Transport for NSW project teams. That June 2020 figure of 5,250 dwellings was superseded by subsequent planning documents; any other total yield figures should be evaluated individually against their specific scope and source documents.

Two separate planning proposals sit outside the Dahua estate totals. Both are rezoning requests seeking substantial density increases beyond earlier release area plans, not development applications and not consents:

  • Rosalind Park (PP-2022-3252) covers about 264 hectares at 33 Medhurst Road and 101 and 111 Menangle Road. Its Gateway determination sets an initial cap of 290 dwellings with a maximum potential of 1,450 dwellings, exhibited in July–August 2026.
  • Menangle Park (East Village) (PP-2024-2724) covers 22 parcels (about 19 hectares) in the established village grid, where existing R2 zoning permits about 340 dwellings. Michael Brown Planning Strategies has proposed 1,907 dwellings; Council endorsed it for Gateway assessment on 9 December 2025.

Neither proposal’s additional yield belongs in current suburb totals, and neither should be directly added to Dahua’s estate lot counts without reconciling underlying boundaries.

Land area measurements: The October 2016 planning proposal put the entire Menangle Park Urban Release Area at about 958 hectares. Dahua’s landholding inside it was stated at 507 hectares in Council’s March 2022 planning proposal, and is marketed today as 498 hectares.

Roads & access

5

Spring Farm Parkway Stage 1

Transport for NSW

Open

A four-lane divided road running about 1 km from Menangle Road west over the Hume Motorway into the release area, with 600 m of Menangle Road upgraded, four new signalised intersections and a shared-use path on the southern side. It is built and open to traffic. The ramps are city-facing only, so this is motorway access in one direction, not a full interchange.

Current stageOpen
FundingJointly funded by NSW Government and Dahua Group ($206m funding allocation in 2020 business case, published in 2024 summary; not final actual cost)
Stated timingTransport for NSW's project page says it opened to traffic "from Thursday 29 August" 2024; its Stage 2 community update of August 2025 gives 28 August 2024. The two official documents differ by one day.
Last checked9 Sept 2026
Timeline
  1. 2020

    Final business case allocates $206 million (summary published April 2024)

  2. 29 August 2024

    Opens to traffic, on Transport for NSW's project page; its August 2025 Stage 2 update gives 28 August

Read the recordHide the record· 3 sources

Current position. Transport for NSW lists a north-facing exit ramp off the Hume onto Spring Farm Parkway and a north-facing entry ramp back on, so trips north towards Liverpool, Parramatta or the CBD can join the Hume at the parkway.

There are no south-facing ramps, so trips towards Picton Road, Wollongong or Canberra use another interchange. The parkway also carries a shared-use path on its southern side giving walking and cycling access to Broughton Anglican College.

Seen a change on the ground, or is the status here wrong? Tell us →

Spring Farm Parkway Stage 2

Transport for NSW

Public exhibition

A proposed 3 km four-lane divided road that would complete the east-west link from Stage 1 west to Liz Kernohan Drive, joining the Camden Bypass, the Hume Motorway and Menangle Road. The project is funded for planning and design ($15 million committed by NSW and Australian Governments), with the Review of Environmental Factors (REF) on public exhibition in September 2026. Construction funding is not yet determined.

Current stagePublic exhibition
FundingPlanning funded ($15m Australian & NSW Governments); construction unfunded
Stated timingReview of Environmental Factors (REF) on display for comment from 3 to 27 September 2026, the report says; the governments announced it on 7 September. Transport for NSW expects the final business case by early 2027. Construction commencement remains subject to future funding decisions.
Last checked10 Sept 2026
Next stepReview of community submissions from REF exhibition (closing 27 Sept 2026); final business case in early 2027; future construction funding decision
Timeline
  1. 2019

    Early planning begins

  2. 2021

    Route options investigated and a strategic design released for community feedback

  3. June 2024

    Australian and NSW governments commit $15 million for planning

  4. May 2025

    Jacobs Australia appointed to design the road and prepare the environmental assessment

  5. September 2026

    Review of Environmental Factors on display for comment; the report gives 3 September as the start, and the governments announced it on 7 September

  6. 27 September 2026Deadline · Transport for NSW

    Public comment closes at 11:59pm

  7. Early 2027Target · Transport for NSW

    Final business case

Read the recordHide the record· 8 sources

Current position. The $15 million committed by the Australian and NSW Governments funds environmental assessment and concept design. Jacobs Australia was appointed in May 2025 to do that design work.

No construction funding has been announced for the western link to Camden and the Camden Bypass (see our report). Transport for NSW estimates that the completed parkway will divert between 20,000 and 30,000 vehicles per day from Narellan Road. The Review of Environmental Factors is on display for comment from 3 September 2026, the report says (the governments announced it on 7 September), with comments closing 11:59pm Sunday 27 September 2026 (see our report). Transport for NSW has also released an official corridor map and a 3D flyover animation illustrating the proposed alignment, bridge crossings and shared paths. Transport for NSW targets completing the final business case by early 2027. Construction procurement and delivery will be subject to a subsequent construction funding decision in a future state budget.

Seen a change on the ground, or is the status here wrong? Tell us →

Menangle Road upgrade

Transport for NSW

Planning

Widening and safety upgrades for Menangle Road between Tindall Street, Campbelltown and Cummins Road, Menangle Park. Ground investigations were completed in 2023, and the project is listed in the 2026 Sydney Plan Infrastructure Opportunities Plan with a business case in progress under the $65 million South West Sydney Roads Planning program. Planning runs to 2028; no construction funding or start date has been announced.

Current stagePlanning
FundingPlanning funded ($65m South West Sydney Roads Planning program); construction unfunded
Stated timingTransport for NSW strategic business case in progress to 2028. No construction funding or start date has been announced.
Last checked9 Sept 2026
Next stepCompletion of strategic business case by 2028; government decision on future construction funding
Timeline
  1. 2023

    Ground investigations completed

  2. February 2026

    Listed in the Sydney Plan's Infrastructure Opportunities Plan, with a business case in progress

  3. 2028Target · Transport for NSW

    Business case completed

Read the recordHide the record· 3 sources

Current position. Menangle Road connects Menangle Park to Campbelltown, and this upgrade is at the investigation stage. The program funds planning, not construction. Business cases are due by 2028, and any construction funding would be a separate decision after that.

The project infoline is 1800 684 490.

Seen a change on the ground, or is the status here wrong? Tell us →

Appin Road upgrade Stage 1

Transport for NSW

Open

Widening of Appin Road from two to four lanes in part, with safety barriers, new intersections into the Figtree Hill community and five kilometres of koala exclusion fencing. Transport for NSW says construction was completed in March 2026, so this one is finished and open. Stage 2, covering further safety improvements and an additional wildlife underpass at Beulah Reserve, is at strategic concept design stage.

Current stageOpen
FundingFunded and delivered by Stockland under a Voluntary Planning Agreement with Transport for NSW
Stated timingTransport for NSW says Stage 1 construction was completed in March 2026. Stage 2 has no construction date.
Last checked9 Sept 2026
Next stepStage 2 strategic concept design; Bradbury intersection upgrade construction
Timeline
  1. January 2026

    Appin Road and St Johns Road intersection upgrade at Bradbury determined, with $22.5 million committed

  2. March 2026

    Stage 1 construction completed, Transport for NSW says

  3. 2026Target · Transport for NSW

    Construction of the Bradbury intersection upgrade to start

Read the recordHide the record· 4 sources

Current position. Appin Road is the run south-east towards Appin and on to Wollongong via Bulli Pass, and the finished Stage 1 section is wider than it was. The koala fencing changes where wildlife crosses, and a fauna underpass near Noorumba Reserve, beneath Appin Road, is complete and open.

Further north, the Appin Road and St Johns Road intersection upgrade at Bradbury was determined in January 2026 with $22.5 million committed by the Australian Government, and Transport for NSW said construction was expected to start in 2026 and take about 12 months. As at 30 August 2026 the project page showed “Project determination”.

Seen a change on the ground, or is the status here wrong? Tell us →

New Menangle Road estate intersection

Transport for NSW (design approval); Dahua Group Australia (delivery)

Proposed

A new intersection on Menangle Road that would connect Miracle Mile Boulevard North to Danehill Avenue South, giving the estate another way in and out. Dahua Group Australia says it is working with Transport for NSW to obtain design approval. As at the developer's August 2026 newsletter the project was at the design-approval stage — not approved and not under construction.

Current stageProposed
FundingDeveloper proposal (delivery funding not published)
Stated timingDahua Group Australia's Spring 2026 newsletter says works were expected to commence later in 2026, with construction targeted for completion by the end of 2027.
Last checked9 Sept 2026
Next stepTransport for NSW design approval; works targeted to commence later in 2026
Timeline
  1. August 2026

    At design approval stage with Transport for NSW, Dahua's Spring 2026 newsletter says

  2. Later in 2026Target · Dahua

    Works to commence

  3. End of 2027Target · Dahua

    Construction to be completed

Read the recordHide the record· 1 source

Current position. A second signalised access point would give the estate another way in and out. At present the estate’s traffic reaches Menangle Road through a small number of connections.

The source for this project is the developer’s newsletter, and the milestone it reports is design approval, which Transport for NSW gives. A late-2026 start is Dahua’s expectation; the timing depends on Transport for NSW granting it, which the newsletter says Dahua is working to obtain.

Seen a change on the ground, or is the status here wrong? Tell us →

Rail & public transport

3

Menangle Park railway station

Transport for NSW

Open

The suburb has its own station on the Southern Highlands Line at Racecourse Avenue, operating passenger services towards Campbelltown and Moss Vale (broadly hourly). The station is unattended, classified as Assisted Access, and has no Opal top-up facilities. For detailed walking routes from new estate stages, parking arrangements, and accessibility notes, see our getting around guide.

Current stageOpen
FundingNot announced / unconfirmed
Stated timingTransport for NSW says planning and investigations are still underway to determine the final scope and construction start date for the remaining Rail Infrastructure Upgrades locations. Menangle Park has no announced construction date.
Last checked9 Sept 2026
Next stepNetwork investigations by Transport for NSW; no construction dates announced
Timeline
  1. February 2026

    Transport for NSW notifies site investigations, surveying and vegetation work between Tallong and Menangle Park

Read the recordHide the record· 3 sources

Current position. Menangle Park Station remains in normal passenger operation on the Southern Highlands Line, with direct trains taking about 6 minutes to Macarthur and 8 to 12 minutes to Campbelltown. Transport for NSW’s February 2026 notification confirmed that recent corridor activity was limited to site investigations, surveying and vegetation management; planning investigations continue, but no construction start date has been announced.

For detailed commute timetables, measured walking routes from new estate stages, station parking, and accessibility arrangements, see our dedicated getting to work guide and getting around guide.

Seen a change on the ground, or is the status here wrong? Tell us →

Bus route 889 seven-day service

Transit Systems NSW SW, for Transport for NSW

Open

Route 889 is an existing route that was upgraded in 2026. From 5 July 2026 the Macarthur to Menangle loop via Menangle Park became a seven-day service with an additional 83 trips a week, where it had previously run up to twelve times a day, six days a week. The current timetable shows about 23 weekday trips and hourly running on Saturdays, Sundays and public holidays from roughly 6am to 10pm. It is open and operating.

Current stageOpen
FundingPublicly funded ($452m NSW outer-suburban bus package)
Stated timingThe upgraded seven-day service started on 5 July 2026, funded from the $452 million committed in the 2025-26 NSW Budget to expand outer-suburban bus services.
Last checked4 Oct 2026
Timeline
  1. May 2026

    Seven-day upgrade announced, funded from the 2025-26 NSW Budget

  2. 5 July 2026

    Seven-day service starts, with 83 extra trips a week

  3. 20 July 2026

    Revised timetable takes effect

Read the recordHide the record· 4 sources

Current position. Route 889 operates seven days. Journey times between the estate and Macarthur depend on the direction, stopping pattern and travel date.

Because it is a loop, the station has an outward stop and a return stop. The 07:02 Macarthur trip reaches them at 07:21 and 07:37 respectively, returning to Macarthur at 07:59 on the timetable valid to 11 October, or 08:03 on school days from 12 October with a Broughton Anglican College stop. Check the direction and travel date. It remains the only regular public bus route serving Menangle Park, on Transport for NSW’s route information checked on 30 August 2026.

Every 889 trip is wheelchair accessible. The accessible symbol heads every service column on the current timetable — weekday, Saturday and Sunday — and the timetable’s own note says the buses have low floors and space for a wheelchair, pram or stroller. Transport for NSW’s platform data does not mark Menangle Park Station itself as wheelchair accessible.

Seen a change on the ground, or is the status here wrong? Tell us →

Bus route 845 to Western Sydney International

Transport for NSW

Open

A bus route linking Campbelltown with Western Sydney International Airport via Oran Park, every 30 minutes from 5am to 10pm, seven days a week. Transport for NSW says it started on Sunday 5 July 2026, so the route is running. Transport for NSW's airport-travel page says access into the airport site will not be available until the airport opens in late October 2026.

Current stageOpen
FundingPublicly funded (Transport for NSW Western Sydney bus network)
Stated timingThe Australian Government says Western Sydney International (Nancy-Bird Walton) Airport began freight operations on 26 July 2026, with Qantas Freight regular services from 27 July, and opens to passengers on 25 October 2026.
Last checked3 Sept 2026
Next stepDirect airport access commencement on passenger opening (25 October 2026)
Timeline
  1. 5 July 2026

    Route 845 starts, Campbelltown to Western Sydney International via Oran Park

  2. 26 July 2026

    Airport begins freight operations, the Australian Government says

  3. 25 October 2026Target · the Australian Government

    Airport opens to passengers; Transport for NSW says buses can enter the airport site from late October

Read the recordHide the record· 3 sources

Current position. There is no direct bus from Menangle Park to the new airport. The 845 starts at Campbelltown Station: take the train to Campbelltown and change, or from the 889 change at Macarthur for a one-stop train to Campbelltown first. The trip takes two or three connections, each on its own timetable.

By car it is about 33 km and 38 minutes from the estate entrance on a routed estimate without live traffic, via the Hume Motorway, Narellan Road and The Northern Road — signalised arterial roads for most of the way, not motorway. The toll-free M12, open since 14 March 2026, serves the airport from the M7 side and is not on this route. Transport for NSW’s page, in its note on the M12, says access into the airport site will not be available until the airport opens in late October 2026. Passenger flights begin on 25 October.

Seen a change on the ground, or is the status here wrong? Tell us →

Shops & town centre

1

Woolworths neighbourhood shopping centre, within the planned Town Centre

Campbelltown City Council · 2503/2026/DA-C

Under assessment

A full-line Woolworths, specialty retail, childcare, a medical centre and an indoor recreation facility with a swim school, proposed on a site of about 37,000 sqm inside the estate. Woolworths lodged DA 2503/2026/DA-C with Campbelltown City Council in May 2026 and the application is under assessment. It has not been publicly exhibited, determined or approved. Woolworths describes it as a neighbourhood shopping centre that is part of the planned Menangle Park Town Centre; the application covers that retail component, not every element shown in earlier Town Centre masterplans. Menangle Park has no supermarket of its own in the meantime.

Current stageUnder assessment
FundingCommercial development (DA lodged by Woolworths)
Stated timingDahua Group Australia says construction is targeted to start in 2027 with opening anticipated late 2028, subject to approval. Woolworths' consultation site lists public exhibition and Council determination as stages to come.
Last checked9 Sept 2026
Next stepPublic exhibition and Campbelltown City Council DA determination (DA 2503/2026/DA-C)
Timeline
  1. June 2020

    Dahua's revised masterplan describes a 30,000 sqm retail and employment zone

  2. May 2026

    Woolworths lodges DA 2503/2026/DA-C with Campbelltown City Council

  3. 2027Target · Dahua

    Construction to start, subject to approval

  4. Late 2028Target · Dahua

    Opening, subject to approval

Read the recordHide the record· 4 sources

Current position. The proposed shopping centre is under assessment and is not operating. There is no supermarket, pharmacy or post office in the suburb; Macarthur Square and Marketfair Campbelltown are about 7 to 8 km north along Menangle Road.

An application under assessment can be modified, refused, or approved with conditions that shift the design and the timing. 2027 construction and a late-2028 opening are the proponent’s targets, subject to approval. Dahua’s 2020 revised masterplan described a 30,000 sqm retail and employment zone for Menangle Park. This application is the retail component now before Council. The application can be followed on Council’s Development Online under 2503/2026/DA-C.

Seen a change on the ground, or is the status here wrong? Tell us →

Schools

1

Menangle Park public primary school

School Infrastructure NSW (NSW Department of Education)

Planning

A new NSW public primary school with co-located public early learning, initially for 500 students. School Infrastructure NSW's September 2026 update says the master plan has been validated and concept design is almost complete. The agency plans a community information session in Term 4 2026 and submission and public exhibition of the Review of Environmental Factors (REF) in late 2026. Its opening target remains Day 1, Term 1 2029.

Current stagePlanning
FundingFunded in NSW Budget ($4.499m allocated 2026-27; part of $9.2bn state school program)
Stated timingSchool Infrastructure NSW retains an opening target of Day 1, Term 1 2029, with initial capacity for 500 students and provision for future expansion.
Last checked2 Oct 2026
Next stepCommunity design information session in Term 4 2026; REF submission and public exhibition in late 2026; remaining site assessments and investigations
Timeline
  1. June 2026

    Planning update: initial master plan complete; funded in the 2026-27 NSW Budget

  2. September 2026

    Master plan validated; concept design almost complete, the September update says

  3. Term 4 2026Target · School Infrastructure NSW (September 2026 update)

    Community information session to share the first school designs and invite feedback

  4. Late 2026Target · School Infrastructure NSW (September 2026 update)

    Review of Environmental Factors submitted and publicly exhibited

  5. Late 2026Target · School Infrastructure NSW (June 2026 indicative timeline)

    Planning approval

  6. Early 2027Target · School Infrastructure NSW (June 2026 indicative timeline)

    Construction contract awarded

  7. Mid 2027Target · School Infrastructure NSW (June 2026 indicative timeline)

    Construction starts

  8. Late 2028Target · School Infrastructure NSW (June 2026 indicative timeline)

    Construction finished

  9. Day 1, Term 1 2029Target · School Infrastructure NSW

    School opens to students

Read the recordHide the record· 5 sources

Current position. The September planning update records a validated master plan and an almost complete concept design. School Infrastructure NSW plans a Term 4 2026 community session and REF submission and public exhibition in late 2026.

The September update describes the transfer of the school land from Dahua Group as being in its final stages, with completion and formalisation expected that month. The agency says it has signed a site access agreement for remaining site assessments, specialist reports and investigations.

The planned scope includes 24 classrooms, three support learning classrooms, co-located public early learning, a hall, a covered outdoor learning area, a full-sized playing field and a multipurpose court. The June update places the site centrally near the future proposed town centre. The official project page does not list a school street address or intake boundary. See schools and childcare for existing school options and catchments.

School Infrastructure NSW places the project within the $4.1 billion for new and upgraded schools in Western Sydney, part of the 2026-27 Budget’s $9.2 billion school infrastructure program. Budget Paper No. 3 allocates $4.499 million to the school and early childhood component together in 2026-27; this is an annual allocation, not the total project cost.

The planning approval and construction dates in the timeline come from the June 2026 indicative programme. The September update retains the opening target of Day 1, Term 1 2029.

Seen a change on the ground, or is the status here wrong? Tell us →

Parks & open space

3

Northern Hill Top Park (Dahua's name)

Dahua Group Australia (delivery); Campbelltown City Council (land dedication under the 2024 planning agreement)

Open

Dahua's name for the landscaped park on the high ground in the northern part of its estate, at the top of Mount Pleasant Drive; Council does not list a park by that name. It is open: this guide photographed it finished on 4 September 2026, and Dahua's Spring 2026 newsletter says it opened in 2025. It is the estate's only finished hill top park — the southern one was still being built when checked on 21 September 2026, and Dahua's Spring 2026 newsletter says the sports precinct has not started.

Current stageOpen
FundingDeveloper delivered (Dahua Group Australia / dedicated to Council)
Stated timingOpen. Dahua Group Australia's Spring 2026 newsletter says it opened in 2025; this guide photographed it open on 4 September 2026.
Last checked21 Sept 2026
Timeline
  1. 2025

    Opened, according to Dahua's Spring 2026 newsletter

  2. 4 September 2026

    Photographed open by this guide: playground under shade sails, pergola walk, lawn and sports court

Read the recordHide the record· 3 sources

Current position. This park is open. We photographed it on 4 September 2026: a circular lawn, a playground under shade sails, a pergola walk, benches, new planting and a fenced sports court. Dahua’s newsletter dates the opening to 2025. The Menangle Park DCP requires every dwelling in the release area to sit within 400 metres of a public park, and most of that network is yet to be built.

“Northern Hill Top Park” is the developer’s name, and Council does not list a park by it. Open space land across the estate is being dedicated to Campbelltown City Council under the 2024 planning agreement, which is what eventually makes maintenance Council’s job rather than the developer’s.

Seen a change on the ground, or is the status here wrong? Tell us →

Southern Hill Top Park (Dahua's name)

Dahua Group Australia

Under construction

Dahua's name for about 11,000 square metres of landscaped elevated open space in the southern part of its estate; Council does not list a park by that name. Dahua says it is being delivered with the Stage 4 South release. It was still under construction when checked on 21 September 2026. Dahua Group Australia targeted completion in late Q3 2026 with a community opening shortly afterwards — a developer target, not an opening date.

Current stageUnder construction
FundingDeveloper delivered (Dahua Group Australia / Stage 4 South)
Stated timingIn its Spring 2026 newsletter, Dahua Group Australia said completion was expected in late Q3 2026, with a community opening shortly afterwards.
Last checked21 Sept 2026
Next stepCompletion of landscaping and public opening
Timeline
  1. September 2024

    Dahua announces construction starting on Stage 4 South, the release this park is delivered with

  2. 21 September 2026

    Still under construction when checked by this guide

  3. Late Q3 2026Target · Dahua

    Completion, with a community opening shortly afterwards

Read the recordHide the record· 2 sources

Current position. The second of the two hill top parks, and the one that serves the southern end of the estate. It was still under construction when we checked on 21 September 2026. Dahua targeted completion by the end of September 2026, with a community opening shortly afterwards — a developer target, not an opening date.

Seen a change on the ground, or is the status here wrong? Tell us →

Southern Riparian and Sports Fields precinct

Dahua Group Australia

Proposed

The estate's planned sports and recreation precinct — almost 20 hectares of open space with sporting fields, multipurpose courts, an amenity building and dedicated parking, plus a riparian corridor project with an elevated boardwalk and picnic shelters. It is proposed, not built and not started. As at the developer's August 2026 newsletter, works were programmed to commence in Q4 2026.

Current stageProposed
FundingDeveloper proposed (delivery funding arrangement not stated by the developer)
Stated timingDahua Group Australia's Spring 2026 newsletter says works were programmed to commence in Q4 2026. That is a developer forecast, and the works had not started when it was published.
Last checked9 Sept 2026
Next stepDetailed design, planning approval and contractor procurement; works programmed by developer for Q4 2026
Timeline
  1. Q4 2026Target · Dahua

    Works to commence

Read the recordHide the record· 2 sources

Current position. The public sports fields planned for the estate have not been built.

The project manager acting for Dahua describes a Playing Fields Park with four sports fields, kick-about areas, an amenities building, a themed playground, shared paths, parking and lighting. The developer’s published timing is “programmed to commence Q4 2026”.

Seen a change on the ground, or is the status here wrong? Tell us →

Community facilities

1

Menangle Park Release Area Planning Agreement

Campbelltown City Council

In force

The executed agreement that binds the developer to deliver Menangle Park's public infrastructure. It is filed here as in force because it is signed and operating — but it is a contract between Council and the developer, not a development consent, and it approves no building by itself. Campbelltown City Council and two Dahua entities entered into it on 15 August 2024, covering all of Dahua's Menangle Park landholding and revoking the earlier February 2021 Stages 1, 2A and 2B agreement. It defines the development as creating up to 4,525 final lots, and commits about $202 million of infrastructure and about 1,021,922 square metres of land dedication. Those are staged obligations contingent on the development proceeding, not money already spent.

Current stageIn force
FundingExecuted planning agreement (~$202m staged developer contributions)
Stated timingObligations are staged and fall due as development proceeds. Council's register records $7,123,347.42 in monetary contributions already paid for Stages 1 and 2A.
Last checked9 Sept 2026
Next stepOngoing delivery and land dedications as subdivision stages proceed
Timeline
  1. February 2021

    Earlier agreement covering Stages 1, 2A and 2B

  2. 15 August 2024

    Council and two Dahua entities enter the Release Area agreement, revoking the 2021 one

Read the recordHide the record· 2 sources

Current position. This is the document behind most of the parks, roads and drainage on the masterplan. Council’s register breaks the commitment into open space and recreation land and works, traffic and transport land and works, trunk drainage and water quality, and community facility land.

The headline figure is what the developer is obliged to deliver over the life of the estate, in stages and as development proceeds; it is not money already spent. Council’s register is public and records what has been dedicated to Council so far.

Seen a change on the ground, or is the status here wrong? Tell us →

Utilities

3

Sydney Water servicing works

Sydney Water

Under construction

Sydney Water is building a new wastewater pumping station at Menangle Road and Danehill Avenue and upgrading the existing station north of Fitzpatrick Street, both in Menangle Park, and building a second new station at Rotolactor Parade in Menangle (2568), with a 2.2 km water main between the two suburbs. Work is under construction. Sydney Water says the infrastructure will service about 4,000 new homes in Menangle Park, and that the water main provides capacity for 750 new homes. All completion dates below are Sydney Water projections and subject to change.

Current stageUnder construction
FundingSydney Water capital works program
Stated timingIn its 7 July 2026 update Sydney Water said the new pumping station at Menangle Road and Danehill Avenue was on track to be finished by March 2027; the upgrade to the existing station north of Fitzpatrick Street was almost finished and due by September 2026; the Menangle pumping station was expected by August 2027; and the 2.2 km water main, about 1.7 km complete, was expected by September 2026.
Last checked30 Aug 2026
Next stepCommissioning of Menangle Road pumping station (targeted March 2027) and completion of water main (September 2026)
Timeline
  1. 7 July 2026

    Sydney Water update: about 1.7 km of the new water main laid

  2. September 2026Target · Sydney Water

    Upgrade of the existing pumping station north of Fitzpatrick Street finished

  3. September 2026Target · Sydney Water

    2.2 km water main to Menangle finished

  4. March 2027Target · Sydney Water

    New pumping station at Menangle Road and Danehill Avenue finished

  5. August 2027Target · Sydney Water

    New pumping station at Rotolactor Parade, in Menangle (2568), finished

Read the recordHide the record· 3 sources

Current position. Registration and occupation depend on the required servicing being in place or otherwise accepted. SMEC, the estate’s lead civil designer, says it installed an interim pump-out system while Sydney Water’s permanent pump station was delayed, so residential development could keep going.

Sydney Water describes this infrastructure as servicing about 4,000 new homes, which matches what Dahua markets on its own landholding — “4,000+ homesites”. The two agree, but neither is a cap: the 2024 planning agreement between Council and Dahua allows up to 4,525 final lots. The 4,000 is what the servicing was sized for, not a limit on how many houses are built.

Seen a change on the ground, or is the status here wrong? Tell us →

nbn Fibre to the Premises

nbn

Open

Four Menangle Park addresses checked against nbn's own address servicing lookup on 30 August 2026 all returned Fibre to the Premises, fixed line, available — the highest-tier fixed-line nbn technology, in a greenfields serving area within the Campbelltown coverage area. Ready-for-service dates on those addresses ranged from July 2017 to May 2024. Four addresses is not the whole suburb, so check your own before you sign anything.

Current stageOpen
Fundingnbn co commercial rollout and developer contributions
Stated timingReady-for-service dates returned by the lookup on the addresses checked ranged from July 2017 to May 2024. nbn publishes availability address by address, not suburb by suburb.
Last checked3 Sept 2026
Next stepOngoing connection as subsequent estate stages register and build out
Timeline
  1. July 2017

    Earliest ready-for-service date among the addresses checked

  2. May 2024

    Latest ready-for-service date among the addresses checked

Read the recordHide the record· 3 sources

Current position. Fibre to the premises runs fibre the whole way to the house, with no copper leg. The addresses checked returned FTTP as available. Confirm any installation or new-development charge with your chosen provider before you sign: nbn’s policy for new developments says it may charge a one-time end-user contribution of up to $300 for each premises in a new development, and that providers may pass it on.

Availability is determined address by address, and older parts of Menangle Park were connected at different times from the new estate. Put your exact street address into nbn’s Check Address tool, and if you are buying land, ask for the lot’s status rather than the street’s.

Seen a change on the ground, or is the status here wrong? Tell us →

Endeavour Energy zone substation

Endeavour Energy

Proposed

Endeavour Energy is proposing to upgrade the existing mobile substation on Fitzpatrick Road, Menangle Park to a permanent zone substation with two new transformers, a permanent building, drainage, fencing and a 15-metre communication antenna, plus a new 66kV underground feeder from TransGrid's Macarthur Bulk Supply Point along Fitzpatrick Road and Glenlee Road. Both projects were in environmental assessment under Part 5 of the Environmental Planning and Assessment Act when published. No construction start date is published.

Current stageProposed
FundingEndeavour Energy capital works program
Stated timingEndeavour Energy states the existing mobile substation lacks capacity beyond 2027. Its Distribution Annual Planning Report 2025 records planned commissioning of the permanent substation in FY28, and the September 2025 feeder Review of Environmental Factors gives a 24-to-30-month program from a late-2025 or early-2026 start. No determination and no construction start date is published for either the permanent substation or the 66kV feeder.
Last checked30 Aug 2026
Next stepPart 5 EP&A Act determination, site acquisition, and construction scheduling
Timeline
  1. 11 September 2025

    Review of Environmental Factors for the new 66kV feeder, dated 11 September 2025

  2. December 2025

    Distribution Annual Planning Report records planned commissioning in FY28

  3. FY28 (July 2027 – June 2028)Target · Endeavour Energy

    Permanent zone substation commissioned

Read the recordHide the record· 4 sources

Current position. Endeavour Energy says the mobile substation now feeding Menangle Park does not have capacity beyond 2027, and the permanent replacement has no published determination and no published construction start date. It is assessed under Part 5 of the Environmental Planning and Assessment Act, with Endeavour Energy both proponent and determining authority — so there is no council consent to look up. Endeavour describes a forecast capacity constraint; it has published no moratorium, queue or refusal on new connections.

Enquiries go to environment@endeavourenergy.com.au. For outages and electrical emergencies the number is 131 003, 24 hours.

Seen a change on the ground, or is the status here wrong? Tell us →

Housing & land

3

Estate stages 3 North Phase 2 and 4 North

Dahua Group Australia

Under construction

The two residential stages being built in the Dahua estate, delivering 348 lots between them. Dahua says civil construction started in March 2026, with WEM Civil on Stage 3 North Phase 2 and TRN Group on Stage 4 North. As at 30 August 2026 the developer's stage tracker showed both about 40 per cent complete and in the sewer and drainage phase, with titles targeted for April 2027 on Stage 3 North Phase 2 and May 2027 on Stage 4 North.

Current stageUnder construction
FundingPrivate developer civil works (WEM Civil / TRN Group)
Stated timingDahua Group Australia's stage tracker, read on 30 August 2026, targets construction completion on 26 March 2027 for Stage 3 North Phase 2, with titles in April 2027 and settlement from 29 April 2027; and 22 April 2027 for Stage 4 North, with titles in May 2027 and settlement from 15 May 2027. The Spring 2026 newsletter had anticipated construction completion in the first quarter of 2027. All are developer projections.
Last checked30 Aug 2026
Next stepCompletion of sewer and drainage works; titles targeted April–May 2027
Timeline
  1. March 2026

    Civil construction starts, Dahua says: WEM Civil on Stage 3 North Phase 2, TRN Group on Stage 4 North

  2. 26 March 2027Target · Dahua

    Stage 3 North Phase 2 construction complete

  3. 22 April 2027Target · Dahua

    Stage 4 North construction complete

  4. 29 April 2027Target · Dahua

    Stage 3 North Phase 2 settlements begin

  5. April 2027Target · Dahua

    Stage 3 North Phase 2 titles

  6. 15 May 2027Target · Dahua

    Stage 4 North settlements begin

  7. May 2027Target · Dahua

    Stage 4 North titles

Read the recordHide the record· 3 sources

Current position. Civil works are under way in both stages. The sequence is civil works, then registration of the plan (titles), then settlement, then building. The developer publishes target dates for construction completion, titles and settlement; each is a target until it is reached.

Spine Road South is finished and delivered 49 lots in the Rosewood release. The developer’s tracker lists eight earlier stages that reached titles between the fourth quarter of 2023 and January 2026 — Stage 3 South 3.1 to 3.4, Stage 2B, then 3.6, 3.8 and 3.7, Stage 3 North in June 2025, and Stage 4 South 4.1 to 4.2 in late September 2025 and 4.3 to 4.4 in January 2026. That is a record of stages registered, not a count of lots or houses.

The latest published count of homes is a developer figure of approximately 250, dated 23 September 2024; no current count of completed or occupied homes is published, so any current population figure is an estimate.

Seen a change on the ground, or is the status here wrong? Tell us →

Rosalind Park planning proposal

Campbelltown City Council (reporting) and the NSW Department of Planning, Housing and Infrastructure (making the plan) · PP-2022-3252

Under assessment

A rezoning request for about 264 hectares off Medhurst Road, on the other side of the Hume Motorway from the Dahua estate: a ceiling of 1,450 homes, capped at 290 to start, with a school site, two small centres and a koala corridor. Exhibited in July and August 2026. On 28 August the Department extended its deadline: Council must report by 18 December 2026 and the rezoning be finished by 26 February 2027. It approves no house.

Current stageUnder assessment
FundingPrivate proposal. The proponent's offer at lodgement valued land and works at $66.2 million for State infrastructure and $84.4 million for local; Council's February 2026 report says the offer needs re-evaluating, and no draft planning agreement has been published.
Stated timingThe Department's Gateway alteration of 28 August 2026 requires Council to report the proposal to the Planning Secretary for a final recommendation by 18 December 2026, and the amendment to be completed by 26 February 2027. It cannot be determined until any State planning agreement is resolved.
Last checked21 Sept 2026
Next stepCouncil's post-exhibition report, a transport plan endorsed by Transport for NSW, and the State planning agreement
Timeline
  1. 13 October 2022

    Lodged with Council by SJB Planning for Leda Holdings

  2. 11 July 2023

    Council endorses it and asks for a Gateway determination

  3. 25 August 2025

    Gateway determination issued, about two years later, capping the site at 290 homes to start

  4. 9 October 2025

    First alteration, on the timing of the development control plan

  5. 6 November 2025

    Rural Fire Service writes that it cannot see compliance with bushfire rules, citing one road in and out

  6. 28 November 2025

    Revised proposal lodged to meet the Gateway conditions

  7. 10 February 2026

    Revised proposal reported to Council, recommended for exhibition

  8. 8 July – 21 August 2026

    Public exhibition

  9. 25 August 2026

    Original 12-month timeframe runs out with the rezoning not made

  10. 28 August 2026

    Second alteration extends the timeframe; published on the Planning Portal on 21 September

  11. 18 December 2026Deadline · set by the Department

    Council's final recommendation to the Planning Secretary

  12. 26 February 2027Deadline · set by the Department

    Rezoning to be completed

Read the recordHide the record· 10 sources

What this means for Menangle Park. Rosalind Park is a request to rezone a second, separate block of land in the suburb — about 264 hectares at 33 and 65 Medhurst Road and 101 and 111 Menangle Road — from rural land to housing. It is not part of the Dahua estate. It sits on the eastern side of the Hume Motorway, across from the estate, the raceway and the station; Medhurst Road is about 1.8 km south-east of Menangle Park station in a straight line. If the rezoning goes through, it would add up to 1,450 homes to the suburb, on land whose one road in and out, as exhibited, joins Menangle Road.

The number to hold on to is 290. The rezoning would set a ceiling of 1,450 homes, but a Gateway condition caps it at 290. Council says the cap is “linked to Sydney Water’s servicing constraints” and that wastewater has to be resolved before the full number could be built. Sydney Water has advised it can serve up to 290 lots through the Glenfield system until 2028. Council says the Gilead 2 proposal had a cap imposed for the same reason.

Where it stands, 21 September 2026

Exhibition is over and the deadline has been extended. The proposal was on public exhibition from 8 July to 21 August 2026. Its original timeframe ran out on 25 August 2026 with the rezoning not made. Three days later, on 28 August, the Department altered the Gateway determination and set new dates:

  • Council must report the proposal to the Planning Secretary for a final recommendation by 18 December 2026.
  • The amendment must be completed by 26 February 2027.
  • It still cannot be determined until any State planning agreement is resolved, and its final layout, development control plan and planning agreement must be informed by a transport plan endorsed by Transport for NSW.

The same alteration dropped the requirement, added in October 2025, that a draft development control plan be exhibited before the rezoning is finalised. The plan must still be endorsed before any house is approved, and the conditions say it may be adopted after the rezoning is made. The alteration was published on the Planning Portal on 21 September 2026.

Council has not yet reported on the exhibition, and its exhibition page says the draft development control plan is still being prepared with the Department.

What is proposed

The proposal as exhibited in July 2026 describes:

  • a ceiling of about 1,450 homes, capped at 290 to start, on a range of lot sizes
  • a village centre around the existing Federation-era homestead in the north, and a neighbourhood centre beside the school site in the south
  • a 3.2 hectare primary school site, next to the playing fields
  • about 13.4 to 14 hectares of open space, depending on the layout — 13.97 hectares on the one that assumes a change to the conservation plan, 13.36 hectares on the one that fits the plan as it stands
  • about 76 hectares for environmental conservation, including a koala corridor
  • a Rural Fire Service station site in the south
  • land kept for the Greater Macarthur transit corridor
  • Medhurst Road upgraded to a sub-arterial road, with a possible future crossing of Menangle Creek to the land to the south

Building heights would be 9 metres in the low density zone, 12 metres in the medium density zone, and 12 to 15 metres in the mixed use zone. Standard lots would be at least 420 square metres, or 600 on steep land. Up to 10 per cent of lots could be small lots of 300 to 345 square metres, and up to 20 per cent medium lots of 345 to 420. A Gateway condition requires five per cent of medium density homes to be delivered as affordable housing.

It is being made through the State’s Western Parkland City precincts policy, the same route the Appin and Gilead 2 rezonings took, rather than through Campbelltown’s own local plan. The Department, not Council, makes the final plan.

The main objection on the record

The NSW Rural Fire Service wrote to Council on 6 November 2025, before exhibition, that it “does not consider the proposed planning proposal can demonstrate compliance with PBP, 2019” — the state’s rules for building on bushfire-prone land. Its concern is the way out: the proposal “will rely on one access/egress point to the north of the site onto Menangle Road”, which bushfire could affect, and the proponent’s own traffic assessment found the development “would result in extreme delays and would require major treatments at the Menangle Road and Medhurst Road intersection”. The RFS requires a second access point.

What the land is now

Mostly zoned RU2 Rural Landscape, with a 100-hectare minimum lot size. Council’s report lists current and former uses: AGL’s coal seam gas operations, now decommissioned, including gas wells and the Rosalind Gas Plant, which has been demolished and remediated; a sandstone quarry and crushing plant; a former dairy farm, Rosalind Park; horticulture; and a mobile phone tower. A Federation-era house on the site traces to an 1812 land grant to the convict James Harrex. It has been extensively modified and is not heritage-listed.

Two layouts, one decision still to come

The proponent has asked the Department to change the Cumberland Plain Conservation Plan over part of the site, which is a separate decision from the rezoning. So two layouts were exhibited: one that fits the conservation plan as it stands, and one that assumes the change. If the change is not approved by the time the rezoning is finalised, the rezoning is made on the layout that fits the current plan.

Infrastructure and money

When the proposal was lodged, the proponent offered land and works valued at $66.2 million for State infrastructure and $84.4 million for local infrastructure. Council’s February 2026 report says that offer needs “further refinement and re-evaluation”, given the time taken to issue the Gateway determination. No draft planning agreement has been published, and none was exhibited.

What to watch, and who to ask

The next public step is Council’s post-exhibition report, which will appear on a Campbelltown City Council business paper on Council’s Meetings and Minutes page. That report is where the number of submissions, any answer to the Rural Fire Service on a second access point, and any change to the layout should first appear. It has to reach the Department by 18 December, so look for it at a Council meeting before then.

The Planning Portal record names two contacts for the proposal: Stefan Radmanovic at Campbelltown City Council, 02 4645 4381, and Jordan Clarkson at the Department, 02 9407 2131. Council’s reference is 4125/2022/E-PP.

Seen a change on the ground, or is the status here wrong? Tell us →

Menangle Park (East Village) rezoning

Campbelltown City Council and the NSW Department of Planning, Housing and Infrastructure · PP-2024-2724

Under assessment

A rezoning request for the old village block bounded by Cummins Road, Fitzpatrick Street, Racecourse Avenue and Taber Street — 22 parcels with several owners, about 19 hectares. It would lift the limit from about 340 houses to about 1,907 homes, with apartments up to six storeys. Council endorsed it 8 votes to 2 on 9 December 2025 and sent it to the Department. As at 21 September 2026 the Department has not issued a Gateway determination. It approves no building.

Current stageUnder assessment
FundingPrivate proposal by separate landowners. Council's December 2025 report says the funding of the infrastructure needed to support it "has not been fully detailed and documented"; it would most likely be paid for through contributions under an amended Menangle Park contributions plan, or works in kind, because the land's fragmented ownership makes planning agreements unlikely.
Stated timingNo date. The NSW Planning Portal showed PP-2024-2724 at the Gateway Determination stage on 21 September 2026. The timetable in the planning proposal Council endorsed put a Gateway determination in March 2026, exhibition in April and May 2026, and the plan made in October 2026. The first two dates have passed without either step.
Last checked21 Sept 2026
Next stepA Gateway determination from the Department, then a draft contributions plan and development control plan before any exhibition
Timeline
  1. April 2022

    At a pre-lodgement meeting, Council advises it should not be lodged in its current form

  2. 19 May 2022

    Lodged with Council at 2,179 homes

  3. 8 November 2022

    Council staff recommend it not be supported, calling it a 540 per cent increase; Council defers

  4. January–September 2024

    Reduced to 1,915 homes

  5. 24 October 2024

    Reviewed by Council's Design Excellence Panel

  6. 11 December 2024

    Council's Local Planning Panel advises the proposal is premature

  7. 6 March 2025

    Reduced to 1,874 homes; a later submission that month states 2,073

  8. 24 March 2025

    Council staff advise that about 950 homes, or 60 per hectare, may be an appropriate yield

  9. 7 April 2025

    Council writes that it is not supported in its current form

  10. 10 June 2025

    Staff recommend Council advise that a 2,073-home yield is not supported; Council defers for a briefing

  11. 4 November 2025

    Councillors briefed on a revised scheme

  12. 9 December 2025

    Council endorses the planning proposal for Gateway, 8 votes to 2 — 1,907 homes in the officers' report

  13. March 2026Target · the planning proposal Council endorsed

    Gateway determination

  14. April–May 2026Target · the planning proposal Council endorsed

    Public exhibition

  15. October 2026Target · the planning proposal Council endorsed

    Plan made

Read the recordHide the record· 6 sources

What this means for Menangle Park. East Village is part of the suburb’s older village — the block of existing homes and acreage bounded by Cummins Road, Fitzpatrick Street, Racecourse Avenue and Taber Street, inside the Menangle Park urban release area. It sits west of the planned Menangle Park town centre, across Cummins Road, where Woolworths has a shopping-centre application under assessment. Today its rules allow about 340 houses. The rezoning would allow about 1,907 homes, most of them apartments, in buildings of up to six storeys.

It is not a Dahua proposal. The land is 22 separate parcels, averaging about a hectare each, and the applicant, Michael Brown Planning Strategies, acts for a number of the owners. If the rezoning is made, development would come lot by lot, owner by owner, rather than as one estate.

Where it stands, 21 September 2026

Waiting on the Department. Campbelltown City Council endorsed the proposal on 9 December 2025 and sent it to the Department of Planning, Housing and Infrastructure for a Gateway determination — the decision on whether it can go on public exhibition, and on what conditions. Nine months later the Planning Portal still shows it at that stage, with no decision.

Council’s resolution also asks the applicant for a draft amendment to the Menangle Park contributions plan and a draft development control plan before any public exhibition. A draft development control plan was with Council’s staff in December 2025, needing more work, and is to be reported to Council before exhibition. Neither plan has come before Council since: no agenda or minutes from February to September 2026 mentions East Village, other than February’s routine confirmation of the December minutes. So even after a Gateway determination, there is more work before residents see it on exhibition.

What is proposed

TodayProposed
Homesabout 340about 1,907
ZoningR2 Low Density ResidentialR3 Medium Density, R4 High Density, RE1 Public Recreation and C3 Environmental Management
Height limit8.5 metres11, 12 and 22 metres
Floor space ratio0.55:11.2:1 up to 2.2:1
Minimum lot size420 square metresnone

In buildings, Council’s December 2025 report describes apartment blocks of three, four and six storeys, stepping down to three where they sit next to terraces, and 74 terrace homes of two to three storeys in an R3 zone. There would be 4.1 hectares of open space, centred on a park with room for a children’s playground and pickleball courts, and new east–west paths for walking only.

The patch of Elderslie Banksia Scrub Forest in the north-east corner, an endangered ecological community, would be zoned C3 Environmental Management, about a hectare. The applicant’s earlier map had it as public recreation; Council’s staff asked for the change, and the proposal Council endorsed includes it.

The figure you will see varies. Council’s officers’ report says 1,907 homes. The planning proposal attached to it — the document Council’s resolution endorsed — says “some 1,934”. A draft Council affordable housing plan, deferred on 8 September 2026, restates it as 2,000 apartments and multi-unit dwellings.

Traffic

The proposal carries two sets of traffic findings, and they point different ways.

Its preliminary traffic study forecasts a net increase of over 750 vehicle trips in each of the morning and evening peaks, with the Spring Farm Parkway / North–South Collector Road intersection over capacity — Level of Service F in both peaks — and about 75 to 85 per cent of the new traffic using it. It tests an upgrade there, and a diversion of a third of the release area’s north-east traffic to the Menangle Road / North–South Collector Road intersection.

Later modelling, done at Transport for NSW’s request and approved by it, finds the traffic from the proposal would run at Level of Service D or better until 2051 on the planned future road network, without any upgrades, with the Spring Farm Parkway intersection at B or better to 2041. Transport for NSW told Council on 17 February 2025 that it had no further comments. Council’s June 2025 report still noted that the proposal relies on upgrades at Spring Farm Parkway and two other collector-road intersections, with no funding or staging plan for them.

For anyone who drives out of the suburb at peak hour, the Spring Farm Parkway and Menangle Road intersections with the North–South Collector Road are the ones to watch.

Who pays for the roads and parks

Because the land is in so many hands, Council says infrastructure is unlikely to come through planning agreements. Instead, each owner would pay contributions under an amended Menangle Park contributions plan, or provide works in kind. The applicant has engaged a consultant for an infrastructure delivery plan, which Council described in December 2025 as incomplete, and Council’s report says the funding “has not been fully detailed and documented”. That is one open question Council itself has flagged.

Sewer is the other. Sydney Water advised Council on 9 May 2025 that sewer “will not be available until the future Upper Nepean Advanced Water Recycling Centre” is complete — a facility Council’s report describes as only at the planning stage — and that any interim wastewater servicing before then must be done at no cost to government.

The December 2025 vote

The December 2025 vote was resolution 338/2025, moved by Cr Karen Hunt and seconded by Cr Seta Berbari. Crs Jayden Rivera and Tao Triebels voted against. Crs Warren Morrison, Isabella Wisniewska and Joshua Cotter declared interests and left the chamber for the item; Cr Morrison said he was an alternate member of the Sydney Western City Planning Panel and a director of Club Menangle.

What to watch, and who to ask

The Gateway determination will appear as a document on the PP-2024-2724 record on the Planning Portal. It will say whether the proposal can go on exhibition and on what conditions. After that, watch Council’s business papers for the draft contributions plan and development control plan, which have to come to Council before exhibition.

The Planning Portal record names two contacts: Edmund McGrath at Campbelltown City Council, 02 4645 4608, and Kate Campbell at the Department, 02 5778 1401.

Seen a change on the ground, or is the status here wrong? Tell us →

Every status here reflects the public record, not a promise of delivery. Approvals can be appealed, amended or withdrawn — always check the source document for the current position.